Home
TRO Commissioning
3 years ago
14:54
TRO Replacement of PCB Optics Assembly
3 years ago
11:07
Maintenance of the Flow Meter
3 years ago
4:39
NAT Preparation of Neutralizing Agent
3 years ago
2:06
Maintenance of KRAFT Transformer Rectifier
3 years ago
7:33
Maintenance of Siemens Positioner Flow control valve
3 years ago
3:42
FILTREX ACB Automatic Self Cleaning Backwashing Filter
3 years ago
4:53
Dosing pump DDA Parameterization and Maintenance
3 years ago
4:38
Diaphragm Pump Overhauling
3 years ago
4:36
CLX EX TRO Operation Maintenance Service
3 years ago
2:46
FRAMO cargo pump deck controls.
3 years ago
2:04
Crude oil washing (COW) line on oil/chemical tanker.
3 years ago
0:36
Cargo heater and cargo heating procedres.
3 years ago
1:55
Cargo lines and manifold arrangement on oil chemical tanker.
3 years ago
3:20
Draining of cargo line on oil/chemical tanker.
3 years ago
6:03
SART Transponder.
3 years ago
1:58
Safety Belt.
3 years ago
3:14
Parachute rocket.
3 years ago
0:58
Rescue Boat Launching.
3 years ago
4:07
Pyrotechnics.
3 years ago
3:26
Tankscope. Gas detector.
3 years ago
13:03
Pilot ladder preparation.
3 years ago
1:56
Pilot Ladder preparation.
3 years ago
4:34
Personal Gas Detector.
3 years ago
9:19
Oxygen Monitoring and alarm system of Vapour Return Line.
3 years ago
5:08
Oil level check in davit oil tank.
3 years ago
7:57
ODME testing.
3 years ago
17:16
Mooring / Anchoring operation.
3 years ago
6:26
Main engine preparation for the sea.
3 years ago
3:50
Main engine preparation for departure.
3 years ago
7:21