Calculate for an embankment by mean area method, workout the quantitie s of earthwork for embankment

Calculate for an embankment by mean area method, workout the quantitie s of earthwork for embankment

Calculate the quantities of Earthwork is cutting and filling for road (Mean area method)

Calculate the quantities of Earthwork is cutting and filling for road (Mean area method)

Calculate the quantities of Earthwork is cutting and filling for road with following data

Calculate the quantities of Earthwork is cutting and filling for road with following data

Determine the material requirement for construction of 126 Cu.m, determine W/C

Determine the material requirement for construction of 126 Cu.m, determine W/C

Assuming suitable data, determine the quantities of materials required for 10 m³ of M20 grade

Assuming suitable data, determine the quantities of materials required for 10 m³ of M20 grade

A person wish to sell his building at Rs. 15.00 lakhs. . Find the depreciated value on the building

A person wish to sell his building at Rs. 15.00 lakhs. . Find the depreciated value on the building

The depreciated replacement value of building has to be found out with the following data

The depreciated replacement value of building has to be found out with the following data

Determine the depth of irrigation water which would change 30 cm depth of loam soil into saline

Determine the depth of irrigation water which would change 30 cm depth of loam soil into saline

Calculate osmotic potential in the soil at 28% water content

Calculate osmotic potential in the soil at 28% water content

Determine the design discharge capacity of the (i) tertiary, (ii) secondary,and (iii) main drain.

Determine the design discharge capacity of the (i) tertiary, (ii) secondary,and (iii) main drain.

A quantity of 100 ml of gypsum solution .Estimate the gypsum requirement in meq/100 gm soil.

A quantity of 100 ml of gypsum solution .Estimate the gypsum requirement in meq/100 gm soil.

A lateral has 14 sprinklers spaced 16 m apart. The laterals are spaced 20 m on the main line.

A lateral has 14 sprinklers spaced 16 m apart. The laterals are spaced 20 m on the main line.

Determine the system capacity for a sprinkler irrigation system to irrigate 20 ha of maize crop.

Determine the system capacity for a sprinkler irrigation system to irrigate 20 ha of maize crop.

Determine the required capacity of a sprinkler system to apply water at the rate of 1.25 cm/hr.

Determine the required capacity of a sprinkler system to apply water at the rate of 1.25 cm/hr.

The depreciated replacement value of buildinghas to be found with following details.Assume a rate

The depreciated replacement value of buildinghas to be found with following details.Assume a rate

A company purchased plan for Commed Noon Tile 2019 to 10 There the rausent of plant

A company purchased plan for Commed Noon Tile 2019 to 10 There the rausent of plant

Use straight line, constant percentage method, sinking fund method assuming 8% compound interest.

Use straight line, constant percentage method, sinking fund method assuming 8% compound interest.

life of structure may considered as 80 years. At what cost should the person purchase the building?

life of structure may considered as 80 years. At what cost should the person purchase the building?

Find the depreciated of building what price the building should be purchased?

Find the depreciated of building what price the building should be purchased?

No.5 April 20 plant worth $4,000 was one while a plating 54/00 will be Spa li $2,000ales, and worth

No.5 April 20 plant worth $4,000 was one while a plating 54/00 will be Spa li $2,000ales, and worth

determine the depreciated value of the building. The fixed percentage of depreciation is unity.

determine the depreciated value of the building. The fixed percentage of depreciation is unity.

how to calculate amount of depreciation or to show treatment of plant

how to calculate amount of depreciation or to show treatment of plant

The following data e resillin for the your ending 31st March 2019, relating in Commet No. 2.

The following data e resillin for the your ending 31st March 2019, relating in Commet No. 2.

Based on the above information, show the treatment of the materials in Contract Account No. 5.

Based on the above information, show the treatment of the materials in Contract Account No. 5.

easiest way to determine intensity of uniformly distributed load in dss

easiest way to determine intensity of uniformly distributed load in dss

easiest way to solve gusset base designing problem

easiest way to solve gusset base designing problem

find dhe shear force and Bending moment at point #Advance mos

find dhe shear force and Bending moment at point #Advance mos

Determining property tax per year part 2.Engineering economics and financial management (eefm) sppu.

Determining property tax per year part 2.Engineering economics and financial management (eefm) sppu.

Determining property tax per year part 1.Engineering economics and financial management (eefm) sppu.

Determining property tax per year part 1.Engineering economics and financial management (eefm) sppu.

how to use gc/gt in auto cad. how to copy photo drawings in auto cad.

how to use gc/gt in auto cad. how to copy photo drawings in auto cad.